I was faced with an interesting challenge today at 12:50pm.  We have a minor project which I'm not involved directly with, and hasn't needed any testing staff.  However they've had a new supporting website produced to provide information … this had been delivered that morning - could I spend half an hour checking it out for anything "obvious".

This was an ideal opportunity to really stretch my muscles and give it a going over exploratory testing style.  I knew nothing of the website, though maybe that wouldn’t be a disadvantage, I’d evaluate it much as I could within the time allowed.

1:00pm, the link came through.

Opening the page, I began my analysis.  The site was essentially a marketing toy, telling prospective customers about a new service which was being provided, and would allow them to register an interest.  It detailed all the features which were coming, why it would make life a lot easier, as well as links to both supporting partners and associated stories about the initiative.  It also had a top menu bar which allowed you to jump to parts of the page you were interested, which dealt with a particular aspect of the new service.

Several areas had icons, which if you held your mouse over, would allow bubbles to expand, giving a more detailed graphical explanation.

Starting with the basics, I attempted to click every link, every button on the page, making sure it went to the right target.  Two of the links to supporting partners could not be selected with the left mouse button, but could with a right button click menu [Defect 1].

I tried out the webpage in Internet Explorer.  The menu bar buttons did not take you to the right part of the page at all, which was most curious [Defect 2].

I opened the website using Chrome and Firefox (the browsers I had available).  The page looked identical in all browsers.  However in these two browsers the menu bar buttons DID work as expected [Revised defect 2 with this information].

Dragged my mouse over the icons that opened graphical explanations, confirmed they made sense and didn't behave oddly if close to the browser view edge.  I did wonder why one story had two links to website when others only had one (inconsistent) [Defect 3].

Read through the website – did it make sense?  I noticed that two sentences in the same paragraph were virtually identical, and referred to supporting partners in an inconsistent manner [Defect 4].

There was a field to register interest by adding your email address.  Tried a valid email, it was accepted (good).  Tried one junk email, and got told it was invalid (good).  Tried a couple of variations of invalid emails, not all were rejected.  Noted it as a possible problem  [Defect 5].

The bottom of the page had a huge, but empty grey box which just looked messy [Defect 6].

At this point I thought I was done.  Then I had a moment of slyness.  Thinking about how the menu worked for Firefox and Chrome was a little suspicious - I know web developers tend to love working and testing out on these browsers.  Likewise, I also know how web developers love their big, high resolution screens.  So I went into my personalised settings, and dropped my screen resolution to 600 x 800.  The page now no longer fitted to the screen, and some buttons on the menu bar became mangled with some icons missing altogether [Defect 7].

I emailed my list of discoveries to the project manager.  It was 1:30pm and time for lunch.



That was testing at it’s most raw, and a lot of fun (and a nice break from the meetings and documentation of the rest of the day).  For the product, it was a perfectly pitched piece of ah-hoc testing.  I defected everything I thought could be an issue - of those, there are about 3 things which need doing (the non-selectable links, menu not working in IE and probably the behaviour in low screen resolutions), the rest are more about consistency and look, which might be equally important if there's time.

The issue with the menu bars was discovered by a BA during the same time.  But where they reported it, I managed to define it was an Internet Explorer issue, and not one on Chrome and Firefox.  This made me realise that testers are more than people who "find problems" (their BA, a very talented and smart woman did that), however being a tester, it was my nature to go further than just find the problem, but "define the problem".

A most interesting exercise for sure ...

Thursday, April 26, 2012

Roadrunner solutions ... why they need a tester




Last night I was reading Anne-Marie Charrett 's article “I am the Queen of Defocus”.

It's an interesting piece – the idea being really “what is it that some testers bring to the project table”.  Almost any developers understands the technology better.  Many BAs have better understanding of what's written in requirements.

Anne-Marie in evaluating her role has said her skill lies in putting together the “big picture”, or what she calls "defocus".  Many developers can tell you how “their bit” will work, but as long as their piece works as they think, they're not really so intrigued by what's “outside the box”, because from their perspective it's not something they have to work on.  They focus on the areas they're in charge of changing.

A lot of this is understandable – you want people to pay attention to what they're doing.  But at the same time, you need a layer of security that's keen to take over from them, and look at the bigger picture, where the components delivered act in a holistic way.

From this I found myself spinning a fun analogy (sometimes I can't help myself) The Roadrunner project.



Wile E. Coyote is in no doubt an engineering genius and shows great imagination.  His business case is really rather simple “get that bird”.

To this end, he's supplied with everything her could need by the Acme Corperation, and gets to use their pre-tested commercial-off-the-shelf products to scale a suitable roadrunner-catching solution.



The problem is, Wile E. is so focused on how his solution should catch that bird, he's never able (until too late) to see the 1001 ways his solution will go wrong.  Actually watching Roadrunner cartoons is great tester-training, because we'll almost always notice things Wile E. misses, such as

  • The rock he's tied himself to is on the edge of a very dodgy precipice.

  • The trigger to chop his prey is set for Coyote and not Roadrunner weights

  • Although the firework he's strapped to will give him tremendous speed, ultimately it’s designed to go “BOOM!”.

  • His "unit testing" of his trap failed to return the trap to it's original start-up conditions.




Maybe Wile E. Coyote needs a defocused tester …






Saturday, April 21, 2012

The book that test built …



At the beginning of the year, ElisabethHendrickson put together a Leanpub book which was a collection of her notes and essays from over 15 years of writing about testing.

The Leanpub method is a fascinating way to “build an electronic book” from blogs. The idea of building such a book truly appealed and thus the journey on what was to be called “The Software Minefield” began.

As you can tell that was January, and I'm talking here in April – The Software Minefield was not just a dump of every article I'd written on and off this blog.

I've been writing this blog, many times as a reaction to the many challenges of my job – sometimes there are themes over several posts, but mainly I write whatever I feel inspired to by my work. And this is fine for a blog.

But with a book, more than being just a series of articles, it's a journey. And so I collected much of my writing into “chaptered themes”. Some were explored in detail, some were missing areas I'd like to see explored more, so I started to write new articles to “fill in the gaps”. Going further than just this, where many articles for this blog were used as a starting point, every one was visited and revisited – some were rewritten so much only the original title remained.

In all with writing, rewrites, proof-reads, and putting everything together in Leanpub, I probably read each article about 12-15 times. To be honest in March I was getting sick of reading my own writing!

As any good tester will tell you, no matter how much you rewrite and revisit what you've written, there are still defects in there. I've recently had my Father (who is a technical author in his field of metallurgy) proof-read it, and so this weekend I've finally perfected my final draft.

It's been an emotional journey – but it's felt wonderful to achieve the destination. I've been inspired by people like my Grandfather who worked as a mining engineer – he would be able to tell me stories and fables about his mining career, sometimes sad, sometimes funny, sometimes the frustration still in his voice with plain stupidity he'd faced decades ago.

In talking with other testers, it become clear to me that through growing up in a family of engineers like my Father and Grandfather that I picked up a culture around engineering which I always perhaps took for granted. I've been really pleased how other testers have responded to some of my articles, and the aim of the book to help testers think for ways to develop and build relationships in what they do. 

But also important to me is how non-testers like my Mother and my Son have picked up the book, and learned a little about what I do and went “well that made sense to me”.

It's all about storytelling …

[PS – Buy my book!]  



Friday, April 13, 2012

Icebergs ahead ...




This weekend will see the 100th anniversary of the Titanic – some of you might feel compelled to watch the movie, or some form of dramatisation.

The story of the Titanic is one of a ship seen as virtually unsinkable, trouble-spotters yelling “icebergs ahead” and business owners insisting “full-steam ahead”.  Yes there's lots there to think about in terms of projects for sure.

What happened with the Titanic as with many projects which get into trouble, tends not to be a single failure, but a lot of things conspiring to produce absolute disaster.

Virtually unsinkable


Notice the term “virtually” there (it'll come back to haunt us).  There was good reason for this claim to be "virtually unsinkable" – the Titanic had the most advanced system of safety features for it's time.  It had watertight compartments, so it could survive damage to 3 of it's compartments and still remain afloat.

However the iceberg strike damaged 5 compartments, and the watertight compartments didn't go high enough so once they flooded to a certain level they failed completely.

Icebergs ahead



It was known that the Titanic was entering an area of icebergs.  Titanic received warnings of this over the radio, and some iceberg activity was seen around the ship.  However the ship never slowed.

It was considered more important that the ship arrive on time, and such liners were usually ran at their maximum cruising speed to assure this.  It's interesting that Captain Smith had gone on record saying over icebergs he could not "imagine any condition which would cause a ship to founder. Modern shipbuilding has gone beyond that."

Tragically – in this deadly situation the people whose hands the ship was in were the lookouts … and they weren't allowed the tools (binoculars) to be effective.

Ironically ships before had run into icebergs and survived with only bow damage.  It was Titanics attempt to evade the iceberg which caused it's problems, it caused the iceberg to graze the ships side, damaging multiple compartments as it went.  A frontal impact would have most likely damaged one or two compartments (which the ship was designed to cope with).

Disaster contingency


Once the disaster happened, yet more problems conspired.  Much is known how the ship, again having all the necessary lifeboats for the time, only had lifeboats for half the passengers and crew.

But the less than half those on board survived … the crew were not practiced in lifeboat boarding techniques, not even knowing how many people could survive in each boat – some boats were sent out with only half the people on-board.

Combine this with the fact that there were ships nearby who were not obliged (by the regulations of the time) to keep radio operators through the night, so failed to receive the Titanics distress signals, and mistook the distress flares for fireworks.


When you look at disasters like the Titanic, the Challenger Space Shuttle and the Chernobyl meltdown there are similar themes which come out,

  • A lack of imagination to believe a problem could occur.  Who could believe 5 compartments could be damaged?  So only contingency for 3 was built in.  In hindsight only having lifeboats for half the occupants is staggering - yet for the time this was considered more than adequate.
  • Overconfidence in technology.  Captains Smiths comments on how modern shipbuilding is beyond problems with icebergs turned out unjustified.  He didn't even see there being a risk for running at speed in an iceberg area.
  • Driven by demand.  The Titanics need to keep to a timetable meant it would not modify it's speed in a dangerous area.  Richard Feynman would say something similar during the Challenger inquiry, “For a successful technology, reality must take precedence over public relations, for nature cannot be fooled.”
  • Insufficient contingency or disaster plan.  Not using lifeboats to their full capacity.  Not having an agreed system with other ships to monitor for maydays or distress flares.


The Titanic has stuck with us mentally because of the scale of these follies and the awful human price that was paid.  That's why there will always be a sad attraction and fascination to it's story, and why even 100 years on it still haunts us ...

Monday, April 9, 2012

The Easter Bunny Cometh …

It's that chocolaty time of year where everyone is talking eggs and bunnies. Loads of pictures of the cute critters are passing around in the internet on Facebook and Twitter. And yet there is a small part of my mind which wants to cry out in terror …



I lived for a while in England as part of the community of the Isle of Portland, who have a particular quirk that a lot of outsiders will regard as quaint. They have a mortal dread of bunnies. Bunnies are seen as the harbingers of death and doom. The R-word is forbidden – in fact I've known someone who was asked to leave a bar because they thought it funny to mention the word “rabbit”, and it really upset the locals. When the film “Wallace and Grommit and the Curse of the Were-Rabbit” came out, they had to have special posters for the island which removed the R-word.

You've probably read that and had a bit of a giggle. It does sound unbelievable doesn't it? And yet it's completely true. Now read on … There is actually something in this. Portland is most famous for it's stone, of which St Pauls Cathedral in London, The Tower of London, Westiminster Palace, London Bridge were all made.


Within the Portland quarries, warrens of rabbits would sometimes build burrows near the quarry edge. These would weaken the quarry sides, and often cause landslides which would lead to the deaths of the workers below. Workers began to notice the connection between bunnies and deadly landslides, and so someone calling out “rabbit!” would mean “danger ahead”.

Over time the fear of the rabbits remained, passed on by urban myth to each new generation. But the reasoning for it got lost.

The way urban myth plays out is often somewhat fascinating – usually in the stories the grain of truth remains, but a lot of the details get embellished so the real story gets lost. I've found that with a lot of legacy code, similar urban myths hang around about it.

At work at the moment we are using an application which is only about 15 years old. We're making a very small cosmetic change to a part of it, but the team responsible tells us we have to run a complete 6 week regression test – which obviously is more costly than we'd planned. On paper it looks a minor change, which we should only have to test around with a few token checks elsewhere. But several members of the team insist they know someone who knew someone who tried that before and it caused major problems.

We've looked through this application's documentation, and we can't find this written down anywhere. And yet this team's insistence that this level of testing is required is so absolute there's obviously something to what they say, but no quantifiable proof. It does make my role difficult – of course I challenge them on this, but at the same time have to bow down to their experience in this area.

However at the end of the day, I'd like to see just what is myth and what is reason in their argument ...


Monday, February 20, 2012

Learning to test with Big Trak



In the 1980s, Big Trak was the toy you wanted if you were a boy.

It was amazing - a motorised truck which you controlled by entering a program into the keyboard (see below).  You could choose to move it forward, backwards, turn left, turn right and then enter a number which would allow it to turn/move a specified distance.  See a dated demo here!



Hence,


  • UP 2
  • LEFT 15
  • UP 2
  • LEFT 15
  • UP 2
  • LEFT 15
  • UP 2
  • LEFT 15


would cause it to move around anti-clockwise in a box pattern.

You could do up to about 100 instructions, meaning you could do some really fancy patterns.



The toy line has recently been revamped for the 21st Century as Big Trak Jr, and you can buy them reasonably cheaply from places such as here.  [Yes I got one myself]

It's something I'd recommend anyone who's passionate about testing to get their hands on, because it's a very tactile learning tool for teams.  Samantha Laing (@samlaing) was asking for Agile workshop ideas for testing, and I think this really gets the point across.

If you've got hold of a couple, set up an assault course to navigate around, and ask a couple of teams to develop a program to get the Big Trak around the various obstacles.  More than likely you'll see at first someone blundering on, trying to do a big program all in one.  See how that works for them ...

Big Trak really parallels what we do in software.  You can give it to a developer, and it makes a lot of very nice and pleasant beeping noises, so you can assume it's making progress.  But you test it by hitting the GO button, to execute the problem, and more often than not you've missed something and it throws itself off the table or runs into the skirting board.

To make the Big Trak do something cool, you have to balance the programming you're doing with the execution (testing) using the GO button.  There is even a TEST button to allow you to test out a single line command.

We way to build up a complex program to get around an assault course is to do as with software, program a bit at a time, and test.  Then add a little bit more.  For instance the team might have to trial-and-error the distance to the first obstacle before turning etc.

Programming with the Big Trak it soon becomes obvious that if you are going to play with this toy, you're going to have to keep using the GO or TEST buttons.  The program really has no meaning until you hit the GO button.

Likewise in development, what we're working on has no meaning until we've attempted to execute it.  Testing our software, playing with it, is a vital step to seeing if we're doing things right, or sending our Big Trak over a cliff ...

Sunday, February 19, 2012

Roles and responsibilities 101



When I worked on military projects, on day one I would always be shown a project chain-of-command, detailing everyone on the project, their relationship to other roles, pecking-order, job title, responsibility.

In New Zealand, departments tend not to be quite as hierarchical, which can be both a good and bad thing. Good because employees are a lot more empowered than in other parts of the world, and there's no limit of “that's not your place”. Bad because sometimes things got missed and became “I thought you were doing that”, because no two departments did things the same way and so a lot of time everyone just assumed thing's be done the way they were on the last project they'd worked on … even though the team had worked on different prior projects (and so unspoken different expectations).

In some places it's even confusing when it comes to job title. Previously, I was senior tester for my department, and I'd hire "test managers" for projects who'd report to me. I would in turn report to another "test manager" for the whole company.

I decided to deal with this I'd need to write up a list of everything I could conceive we'd need to do for testing, and allocate them to positions – yes roles and responsibities 101. I also decided for simplicity that “manager” was overused, so maybe only the project manager should have this title …

The problem with smaller and newer companies is they might not have mapped out the needs of testing before. They might have previously used only developers or brought in contract staff. If you find yourself in this position, this is an ideal opportunity to take a real leadership role and set out some testing policy and practise. If you're an experienced tester, mentally touch upon every project you've been involved in, and just brainstorm and write all the things you need to happen to make testing succeed.

Here's my list of the key responsibilities within testing. Within New Zealand most of these are “up for grabs” with our looser structure and “all muck in” mentality, although I'm told in America people are much more rigid. Basically I feel someone should be clearly identified in your project to take responsibility each of these actions.

Mentoring of other staff

Not everyone is experienced in the challenges and limitations of testing. That there be a centre of knowledge which should be passed on where possible to more junior staff members, but also needs to be shared with other non-testing staff members such as project managers, developers, business analysts and market managers. This might just take the form of letting other members in the department know what is achievable or not within testing, as well as being the subject matter expert for testing.


Initial estimates for testing

Usually a project will be initially fleshed out by both business analysts and market management to address a business need or opportunity. Looking at the proposed solution, an initial estimate will need to be made of expected effort to test based upon experience of testing similar projects.

This is important, as these estimates will be used to define testing budget. Too small and you risk pushing the project over-budget. But too large and the cost of delivering this solution with testing might just kill the project as “too costly for the benefits it will bring”.

Secure testing budget

This is normally a project manager task, but important to testers, as you need to have this budget secured before you can get on and test. People generally like to be paid.

Resourcing of test staff

Whether staff come from within an organisation, or are brought in as contractors, someone needs to organise the resourcing of test staff. They need to have suitable start and end dates, and any access or permissions set up for when they start.

[As an ex-testing consultant/contract resource who is now bringing such people into his organisation, I pride myself in always having a login and security pass set-up for anyone we're bringing in for their first day. Something I'd often only get after week two.]


Managing delivery of software builds

As a tester it's very hard to test without software. It's got to be in a suitable state and delivered for testing to occur. This is one of those tasks I feel really fall on the project managers shoulder – they're responsible for managing the developers who're delivering this after all.

However it's possible those developers are external and might actually deliver the software via DVD or email “to the guy/gal in charge of testing”.

Organise test environments

Increasingly the software we develop isn't designed to work on just a standalone machine, but has some connection to a larger system. We need to ensure we have a test environment which is representative of the final production system we're going to be using. Someone has to take ownership of organising everything so the testing that occurs can be representative of the end production system. Perhaps you have an environments team in-house, and you just need to book a slot. Maybe you need to actually organise a test server with an external supplier … but someone needs to take charge of this and drive it.


Authoring

Testing has a number of documents which should be created and developed during testing – test strategy, test plans, test requirements, test scripts, test exit reports. Someone needs to write them, meaning ...

Reviewing

Pretty much every document produced by testing needs to be reviewed by those above or at least on a peer level. Otherwise you miss things. This includes test strategies, test plans, test requirements, test scripts, test exit reports …

Progress

You've brought in a contract tester and he's been sitting at his desk on his computer being very busy. But has he actually delivered value this week? Are you making progress?

Junior testers need to be keeping senior testers up to date of what they're achieving and just as important, anything which is slowing them down. The senior testers report up to the project manager. This is how the project knows the status of things withing testing - what's going well and what needs intervention and assistance.

Booking time

Remember that test budget? The more time you spend on testing, the more that budget gets used up. So it's kind of important that everyone on the project books their time at least every week, so the project manager knows where they stand on terms of budget used.

Execute test scripts

Yes indeed, someone has to actually run the tests you've planned. Maybe you've decided to go in more of a exploratory testing direction for test execution – in which you can perhaps reword this. But all the same, someone has to actually test the system.

Defects

If we're going to execute tests, we're likely to raise defects. These have a whole lifecycle of their own, they need to be raised, managed, reviewed (and possibly changed)



Potential test phases for a project

With all that set out, lets try and divide the work over a number of roles. For any project, there are likely to be a number of test phases. Typically they include,

  • Hardware testing
  • Unit testing
  • System testing
  • Acceptance testing
  • Usability testing (if required)



Test Strategist
Across all projects

  • Resourcing of testing staff
  • Mentoring in testing for project staff , managers and test resources

For a project

  • Initial estimates for projects
  • Authors test strategy document, including determining the types of test phases required
  • Review testing plans from projects



Project Manager
Responsibilities for project (regarding testing)

  • Management of delivery of software (and patches) for testing to occur
  • Secure budget for testing
  • Executing the agreed test strategy
  • Reviews and feedbacks regarding

           o Test Strategy and Plan
           o Defects


Testing Chief
Responsibilities for all test phases for a single project

  • Authors high-level test plan for all phases (or delegates to Lead Tester)
  • Coordinating between phases of testing – including getting weekly reports from Lead Testers
  • Arrange organisation of test environment
  • Records time against project through timesheet
  • Reports progress to project manager

On some projects this role will not be required, or else duties delegated between project manager and Lead Tester.


Lead Tester
Responsibilities for a single test phase of a project;

  • Authors detailed test plan – based on Test Strategy Document. Includes revising initial estimates.
  • Requests test environment
  • Reports progress to Project Manager and Testing Chief (if available)
  • Manages defects (assessment, communication, tracking, retest, closure)
  • Authors and manages requirements for testing (review, enhance, assign) based on design and business requirements
  • Review test scripts
  • Authors test exit report
  • Records time against project through timesheet



Tester
Responsibilities,

  • Authors test scripts
  • Execute test scripts
  • Raises defects
  • Retests defects
  • Communicates new defects and issues to Project Manager, Lead Tester, Development in a timely manner, determined by defect severity.
  • Reports progress to Lead Tester
  • Records time against project through timesheet




These roles are pretty scalable to any size of project. If you have a small project needing only one tester, the Lead Tester and Tester role will both be taken by one person. The Testing Chief role will vanish, with those duties either taken by the project manager or Lead Tester.

The most important thing is though to have something like this written, and talk it through with your project manager. All the things on the list need to be done, but they are also to an extent negotiable. It doesn't so much matter who does each item, as long as it has an owner who knows they's supposed to be doing it.